Construction started in 2006 and was finished in 2007.
Surge Space Building
400 Stanger St.The building provides space to temporarily house academic or administrative units that are displaced because of renovations to their home buildings. The facility was designed using a pre-engineered steel frame with its exterior clad in metal panels and precast concrete-like panel accents. The building is designed to be disassembled and recycled in 10 or 15 years.
Building History
- Originally Built:
- 2007
- Map Grid:
- L-2
- Abbreviation / Number:
- SURGE / 170
- Coordinates:
- 37.23301, -80.423